電纜橋架的安裝程序是什么
電纜橋架的安裝程序:
Installer of the cable bridge:
1.測(cè)量定位,安裝橋架的支架,經(jīng)檢查確認(rèn),才能安裝橋架;
Measuring location, mounting bracket of bridge, checking to confirm, to install bridge.
2.橋架安裝檢查合格,才能敷設(shè)電纜;
The bridge will be installed and checked to make the cable.
3.電纜敷設(shè)前絕緣測(cè)試合格,才能敷設(shè);
The cable shall be qualified before the installation of the insulation test.
4.電纜電氣交接試驗(yàn)合格,且對(duì)接線去向、相位和防火隔堵措施等檢查確認(rèn),才能通電。
The electric cable electric transfer test is qualified, and the connection, phase and fire isolation measures are checked and confirmed to be connected.
只有在安裝程序?qū)Φ臅r(shí)候才可以保證產(chǎn)品的質(zhì)量發(fā)揮到高點(diǎn)。公司服務(wù)于客戶,以質(zhì)量上乘、合理和完善的售后服務(wù)與客戶攜手奮進(jìn),共同發(fā)展。質(zhì)量保證,歡迎咨詢洽談。
Only when the installer is correct is the quality of the product to the highest. The company serves the customers in all aspects, with the best quality, reasonable price and perfect after-sales service to work together with the customers to develop together. Quality assurance, welcome consultation.
上一篇:電纜橋架的產(chǎn)品設(shè)計(jì)構(gòu)造與結(jié)構(gòu)分析
下一篇:什么環(huán)境下用全封閉電纜橋架
下一篇:什么環(huán)境下用全封閉電纜橋架
相關(guān)文章 / Recommended news
- 山東電纜橋架線槽什么情況下設(shè)置和不設(shè)置跨接線的要求
- 全長(zhǎng)大于30米的電纜橋架,中間增加與保護(hù)導(dǎo)體的連接怎么做?
- 山東電纜橋架的安裝要求
- 濟(jì)南電纜橋架內(nèi)電纜的固定應(yīng)符合相關(guān)標(biāo)準(zhǔn)規(guī)范的規(guī)定
- 地下室山東橋架安裝檢查驗(yàn)收標(biāo)準(zhǔn)、驗(yàn)收節(jié)點(diǎn)
- 濟(jì)南電纜橋架廠家:弱電工程電纜橋架如何施工才規(guī)范?
- 濟(jì)南電纜橋架安裝施工技術(shù)與管控手冊(cè)
- 山東電纜橋架:電力電纜常識(shí)性知識(shí)和電纜試驗(yàn)方法介紹
- 山東電纜橋架安裝施工要求及規(guī)范
- 濟(jì)南電纜橋架安裝施工要求及規(guī)范
濟(jì)南電纜橋架到底需不需要跨接
安裝橋架
安裝橋架
安裝橋架
防火橋架